Lighting

Upgrading to new energy-efficient lighting, fixtures and controls can save energy, improve productivity, enhance product displays and more.  

Commercial lighting incentives are based on an amount per watt-reduced basis. Customers are categorized into three groups based on annual energy usage and peak demand. Select the button below to find your category.

Express lighting

Express lighting incentives cover up to 70% of the cost to install qualifying LED lighting. Lighting Express allows for smaller or routine projects to apply for incentives with minimal paperwork and a shorter processing time.

Does my project require pre-approval required?

  • Projects with incentives of $10,000 or more: Pre-approval is required before equipment is purchased or installed. Projects that proceed before receiving pre-approval are not eligible for incentives. A pre-installation inspection may be required.
  • Projects with incentives under $10,000: Pre-approval is not required, but it is recommended to help ensure program compliance.

Contact a Wattsmart® Business contractor or Rocky Mountain Power to get started. 

Note: Rocky Mountain Power has a lighting calculation software tool for retrofit projects. It is available for Wattsmart Business contractors to calculate project-specific energy savings, project economics, and eligible incentives for retrofit projects.

How to apply

1. Identify which fixtures to upgrade at your facility.

2. Determine if your project requires pre-approval.   

If your project requires pre-approval (incentives of $10,000 or more):

3. Submit the General Application and a completed IRS Form W-9.

4. Receive approval before purchasing or installing equipment. 

5. Purchase and install qualified fixtures or retrofit kits.

6. After installation is complete, submit invoices showing labor and material costs and any other required project documentation.

7. Receive your incentive check within 45 days after all required documentation has been received and approved.

If your project does not require pre-approval (incentives under $10,000): 

3. Purchase and install qualified fixtures or retrofit kits. 

4. After installation is complete, submit the General Application and a completed IRS Form W-9.

5. Invoices showing labor and material costs, and any other required project documentation. 

6. Receive your incentive check within 45 days after all required documentation has been received and approved.

Flexible lighting

Get cash incentives and technical expertise for lighting upgrades. You can choose a Wattsmart® Business Trade Ally or an independent energy consultant for a lighting analysis.

Does my project require pre-approval required?

  • Projects with incentives of $10,000 or more: Pre-approval is required before equipment is purchased or installed. Projects that proceed before receiving pre-approval are not eligible for incentives. A pre-installation inspection may be required.
  • Projects with incentives under $10,000: Pre-approval is not required, but it is recommended to help ensure program compliance.

Contact a Wattsmart® Business contractor or Rocky Mountain Power to get started.

Note: Rocky Mountain Power has a lighting calculation software tool for retrofit projects. It is available for Wattsmart Business contractors to calculate project-specific energy savings, project economics, and eligible incentives for retrofit projects.

How to apply

1. Identify which fixtures to upgrade at your facility.

2. Determine if your project requires pre-approval.  

If your project requires pre-approval (incentives of $10,000 or more):

3. Submit the General Application and a completed IRS Form W-9.

4. Receive approval before purchasing or installing equipment. 

5. Purchase and install qualified fixtures or retrofit kits.

6. After installation is complete, submit invoices showing labor and material costs and any other required project documentation.

7. Receive your incentive check within 45 days after all required documentation has been received and approved.

If your project does not require pre-approval (incentives under $10,000): 

3. Purchase and install qualified fixtures or retrofit kits. 

4. After installation is complete, submit the General Application and a completed IRS Form W-9.

5. Invoices showing labor and material costs, and any other required project documentation.

6. Receive your incentive check within 45 days after all required documentation has been received and approved.

Incentives for new construction/major renovation

Get cash incentives and technical expertise for new construction and major renovation Controlled Environment Agriculture (CEA) interior lighting. You can choose a Wattsmart® Business Contractor or an independent energy consultant for technical expertise.

  1. Before you start your project, contact us or a Wattsmart® Business Contractor and complete a general application. Note: Projects started with building permits and pre-approval granted prior to March 31, 2022 may qualify for incentives under the previous program tariff. Projects started with building permits after March 31, 2022, or without pre-approval, will not qualify for incentives under the previous tariff. See details on Whole Building New Construction.
  2. We provide project pre-qualification. Be sure you receive pre-qualification before you order equipment. You provide your tax ID in a completed W-9 form so we (or our program administrator) can prepare a 1099-Misc. (if required) following the incentive payment.
  3. Complete your new construction or major renovation lighting project.
  4. Submit project cost documentation including invoices with a breakdown of materials and labor. Then, contact Rocky Mountain Power, a post-installation inspection may be required.
  5. Receive incentive check within 45 days of completion of step 4.

New construction/major renovation lighting incentives

Incentives for New Construction/Major Renovation lighting equipment are available as an integrated piece of the Whole Building New Construction/Major Renovation rebate offering. Please refer to Whole Building New Construction/Major Renovation page for more information.

Projects started with building permits and pre-approval granted prior to March 31, 2022 may qualify for incentives under the previous program tariff. Projects started with building permits after March 31, 2022 or without pre-approval, will not qualify for incentives under the previous program tariff.  Please contact us at 800-931-4113 or newconstruction@resource-innovations.com with questions. 

Market (midstream) lighting incentives

Receive an instant incentive on qualifying high-efficiency lighting products purchased through participating distributors. No waiting, no paperwork.

Program details

  • Lamp replacement incentives are available exclusively through the Midstream Lighting program. 
  • Fixture incentives require an eligible installation address to qualify.
  • Incentives are available for commercial retrofit projects only.

How to participate

Follow these simple steps to receive your instant incentive:

  1. Find a participating distributor using our Wattsmart® Business Contractor tool.
  2. Confirm with the distributor that your installation address qualifies.
  3. Choose and purchase a qualifying product.
  4. Receive the incentive at the time of sale.

Let us help you get started

Need help with project financing?

Rocky Mountain Power teams up with National Energy Improvement Fund (NEIF) to help businesses pay for energy upgrades.                                                             Learn more

See more incentives

Motors and drives

Find out more

Food service

See details

Compressed air

Find out more

Building envelope

Learn more

Appliances and other equipment

See incentives

Wastewater and other

Find out more

Oil and gas

Learn more