Consider these project ideas:
| Production/Upstream | Transportation/Midstream | Refining/Downstream |
|---|
Pump off controller
| VFDs on motor, pumps, fan
| Eliminate recirculation |
Electric Submersible Pump (ESP)
| Piping/line upsizing | Downsize equipment |
| Improve water injection | Add VFD to gas compressor | Process controls |
Energy management projects – custom to your operation, low-/no-cost system optimization.
Results below are for a sample project at a specific facility. Results will vary according to equipment and operating conditions at a specific site.
| Energy Management Measure | Energy (kWh) Savings
| Electric Cost Savings | Installed Cost | Incentive | Payback Before Incentive | Payback After Incentive
|
|---|
| Optimize injection pump | 453,628 | $19,810 | $4,500 | $9,072 | 0.23 yrs. | 0.0 yrs.
|
Percentage of cost paid by incentive
| 202% | $0 | $9,072
| 0.23 yrs. | 0.0 yrs.
|
Custom projects – custom to your operation, capital costs with high savings potential.