Consider these project ideas:
Production/Upstream |
Transportation/Midstream |
Refining/Downstream |
---|
Pump off controller
|
VFDs on motor, pumps, fan
|
Eliminate recirculation |
Electric Submersible Pump (ESP)
|
Piping/line upsizing |
Downsize equipment |
Improve water injection |
Add VFD to gas compressor |
Process controls |
Energy management projects – custom to your operation, low-/no-cost system optimization.
Energy Management Measure |
Energy (kWh) Savings
|
Electric Cost Savings |
Installed Cost |
Incentive |
Payback Before Incentive |
Payback After Incentive
|
---|
Optimize injection pump |
453,628 |
$19,810 |
$4,500 |
$9,072 |
0.23 yrs. |
0.0 yrs.
|
Percentage of cost paid by incentive
|
202% |
$0 |
$9,072
|
0.23 yrs. |
0.0 yrs.
|
Custom projects – custom to your operation, capital costs with high savings potential.
Custom Efficiency Measure |
Energy (kWh) Savings
|
Electric Cost Savings |
Installed Cost |
Incentive |
Payback Before Incentive |
Payback After Incentive
|
---|
Variable speed drive on motor, pump or fan
|
524,724 |
$18,139 |
$66,329 |
$46,430 |
3.6 yrs. |
1.1 yrs.
|
Percentage of cost paid by incentive
|
70% |
$19,899 |
$46,430
|
3.6 yrs. |
1.1 yrs. |