Electric Service Requirements
Do you need to start new electric service? We can help you get plugged in. Before you start the process, check out the links below to get our electric service requirements. Each of the sections of the manual are in PDF format and require a reader for viewing. To download a free reader, visit Adobe's Web site. You can also get a list of approved meter service equipment.
Contents - Title and table of contents
Section 1 - General requirements
Section 2 - Permits and applications
Section 3 - Service and meter installation
Section 4 - Temporary construction service
Section 5 - Clearances
Section 6 - Underground requirements
PacifiCorp Material Specification ZG 031 High-Density Polyethylene (HDPE) Conduit (PDF)
PacifiCorp Material Specification ZG 033 Fiberglass Conduit (PDF)
Section 7 - Single-family service
Section 8 - Multiple-family service
Section 9 - Manufactured and mobile home service
Section 10 - Commercial, industrial and agricultural services
Six State ESR (Entire book)
Questions and comments about the ESR book can be submitted via e-mail to:
esrfeedback@pacificorp.com
Net Metering Requirements:
Idaho
Authorized Generation Types and kW Limits
Net Metering Agreement - Application for Non Residental - Schedules other than 1, 36, 23 and 23A
Utah
Authorized Generation Types and kW Limits
Net Metering Agreement - Application, Level 1: For Inverter Bases Systems 25kW or smaller
Net Metering Agreement - Application, Level 2: Capacity of 2,000 kW or less
Net Metering Agreement - Application, Level 3: Capacity of 2000 kW or less