Electric Service Requirements
Do you need to start new electric service? We can help you get plugged in. Before you start the process, check out the links below to get our electric service requirements. Each of the sections of the manual are in PDF format and require a reader for viewing. To download a free reader, visit Adobe's website.
2011 Electric Service Requirements Manual, 2nd Edition
2nd Edition errata sheet only
We invite you to attend an information seminar regarding the 2011 updates to the electric service requirements.
Related equipment specifications
Approved meter service equipment
PacifiCorp Material Specification ZD 002 Service Pedestal
PacifiCorp Material Specification ZG 031 High-Density Polyethylene (HDPE) Conduit
PacifiCorp Material Specification ZG 033 Fiberglass Conduit
PacifiCorp Power Delivery Policy 228 - Distribution Spill Prevention Control and Countermeasure (SPCC)
ESR White Papers
ESR White Paper: Section 5: Firewalls
ESR White Paper: Section 5: Gated Enclosed Spaces
ESR White Paper: Section 5: Pipe Fittings
ESR White Paper: Section 6: Swedges, Sleeves and Slip Joints
ESR White Paper: Section 9: SPCC
Questions and comments about the ESR book can be submitted via e-mail to:
esrfeedback@pacificorp.com
Net Metering Requirements:
Idaho
Authorized Generation Types and kW Limits
Net Metering Agreement - Application for Non Residental - Schedules other than 1, 36, 23 and 23A
Utah
Authorized Generation Types and kW Limits
Net Metering Agreement - Applicaton, Level 1: For Inverter Bases Systems 25 kW or smaller
Net Metering Agreement - Application, Level 2: Capacity of 2,000 kW or less
Net Metering Agreement - Application, Level 3: Capacity of 2,000 kW or less